Lighting schedule
Ramp model is a planning assumption, not a fixture measurement. Linear uses a 50% average-output factor. Slow-edge models more ramp time near low output (⅓ equivalent); fast-edge models more time near high output (⅔ equivalent). Use Light Lab variable blocks when you have measured ramp data.
Solar clock reference
Optional planning reference only. Enter coordinates and the local UTC offset manually. The calculator estimates standard sunrise/sunset using a civil-sunrise zenith assumption (90.833°); it does not use device location and it does not decide what photoperiod is biologically appropriate.
Interpretation
Photoperiod controls timing. PPFD describes instantaneous photon flux. DLI describes integrated daily exposure. Changing one does not automatically preserve the others.
Compare saved schedules
| Field | Schedule A | Schedule B | Change |
|---|---|---|---|
| Choose two saved schedules to compare. | |||
| Saved | Name | Stage | Lights on | Clock hours | Dawn / dusk | Equivalent hours | PPFD | DLI |
|---|